Free template · No sign-up

Try Accovix accounting for free

Construction Quote Template — Send Professional Estimates

A construction quotation — also called a bid, estimate, or proposal — sets out the price a contractor will charge for a building project before work begins. It breaks the job into scopes like demolition, earthworks, structure, MEP services, and finishes, each with quantities, unit rates, and a subtotal, then adds tax, contingency, and the overall validity period. Clients compare quotations line by line, so clarity wins work: spell out what is included, what is provisional, how long the price holds, and the payment schedule tied to milestones. Provisional sums for unknown site conditions and a clear exclusion list prevent disputes later. This free construction quote template gives you a professional, itemized estimate you can customize with your company details, convert into an invoice when the job starts, and download as a PDF — no signup, no watermark. Use it for residential renovations, commercial fit-outs, and subcontractor bids alike.

Use this template

Sample quotation — Construction & Civil Contractors

Live preview: these exact lines load into the generator (USD, Sales Tax).

QUOTATION

Your Business Name · 123 Market Street

No: QUO-CON-001
Date: 2026-11-14
Bill to: Construction & Civil Contractors Customer
ItemQtyUnitRateTax%Amount
Site survey & soil test
Topographical survey plus geotechnical report
1.00lot850.008.25%850.00
Excavation & earthworks
Cut, fill and compaction to drawing levels
210.00cu yd14.508.25%3045.00
Foundation & slab
Reinforced footings and slab-on-grade
1.00lot12400.008.25%12400.00
Structural framing
Timber frame, roof trusses and sheathing
1.00lot18600.008.25%18600.00
Electrical & plumbing rough-in
Licensed trade rough-in to code
1.00lot7250.008.25%7250.00
Project management
Site supervision across project duration
60.00hrs75.000.00%4500.00
Subtotal
46645.00
Sales Tax
3476.96
Total (USD)
50121.96
Terms: Quotation valid for 30 days from issue date. Price excludes permits, utility connection fees and any unforeseen ground conditions, which will be billed as approved variation orders. Payment schedule: 30% deposit, 40% at lock-up, 30% on handover. Contingency of 5% is included and only spent with written client approval.

Is industry ke Construction & Civil Contractors documents

More Quotation Templates

Quotation template — FAQs

How long is a construction quote valid?

Most construction quotations stay valid for 30 days, because material prices and labor availability move quickly. State the validity window clearly, and note that steel, timber and fuel surcharges may be re-priced after it expires unless a purchase order is received in time.

What is the difference between a quote and an estimate?

An estimate is a best guess that can move; a quotation is a fixed, itemized price you commit to for a defined scope. Clients treat a quotation as a contract basis, so list inclusions, exclusions, provisional sums, and the validity period to keep both sides protected.

Should I include contingency in a construction quote?

Yes — 5–10% contingency is standard for renovation work where hidden conditions are likely. Show it as a separate line so the client sees it transparently, and only draw it down against written approval, which keeps trust high and change-order arguments low.

This sample can be edited in the generator and printed — open the Quotation Generator or see all free tools.